8 × 1000 ft boxes · 60.0 hrs
Labor = drops × 1.25 hr (pull, terminate, test). Edit the hours field to change the rate.
Planning aid only. Values are typical and vary by manufacturer, code edition and jurisdiction. Verify with manufacturer data, NEC/NFPA/TIA and the local AHJ. HireLV is not liable for designs based on these tools.