HireLV Handbook › Wiring diagrams › Intrusion › Honeywell › 4219

Honeywell 4219 Zone Expander

Suggest a correction

Suggest a correction

A free account is required. Reports stay private until a correction is published.

4219 Zone Expander

Flag notes: Zone pairing taken from figure image; second-person check recommended

Eolr 2k Nc no eol
Honeywell 4219Honeywell 4219 Eolr 2k. TB2-1 YEL connects to Data in from control. TB2-2 RED connects to +12 V aux. TB2-3 BLK connects to Ground. TB2-4 GRN connects to Data out to control. TB1 1–2 connects to Zone loop. TB1 2–3 connects to Zone loop (2 shared). TB1 4–5 connects to Zone loop. TB1 5–6 connects to Zone loop (5 shared). TB1 7–8 connects to Zone loop. TB1 8–9 connects to Zone loop (8 shared). TB1 10–11 connects to Zone loop. TB1 11–12 connects to Zone loop (11 shared).Honeywell 4219Eolr 2kKeypad busTB2-1 YELData in from controlTB2-2 RED+12 V auxTB2-3 BLKGroundTB2-4 GRNData out to controlZone ATB1 1–2Zone loopZone BTB1 2–3Zone loop (2 shared)Zone CTB1 4–5Zone loopZone DTB1 5–6Zone loop (5 shared)Zone ETB1 7–8Zone loopZone FTB1 8–9Zone loop (8 shared)Zone GTB1 10–11Zone loopZone HTB1 11–12Zone loop (11 shared)
Honeywell 4219 Eolr 2k. TB2-1 YEL connects to Data in from control. TB2-2 RED connects to +12 V aux. TB2-3 BLK connects to Ground. TB2-4 GRN connects to Data out to control. TB1 1–2 connects to Zone loop. TB1 2–3 connects to Zone loop (2 shared). TB1 4–5 connects to Zone loop. TB1 5–6 connects to Zone loop (5 shared). TB1 7–8 connects to Zone loop. TB1 8–9 connects to Zone loop (8 shared). TB1 10–11 connects to Zone loop. TB1 11–12 connects to Zone loop (11 shared).

Terminals Flag

TerminalGroupFunctionConnects to
TB2-1 YEL Keypad bus Data in from control Flag
TB2-2 RED Keypad bus +12 V aux Flag
TB2-3 BLK Keypad bus Ground Flag
TB2-4 GRN Keypad bus Data out to control Flag
TB1 1–2 Zone A Zone loop Flag
TB1 2–3 Zone B Zone loop (2 shared) Flag
TB1 4–5 Zone C Zone loop Flag
TB1 5–6 Zone D Zone loop (5 shared) Flag
TB1 7–8 Zone E Zone loop Flag
TB1 8–9 Zone F Zone loop (8 shared) Flag
TB1 10–11 Zone G Zone loop Flag
TB1 11–12 Zone H Zone loop (11 shared) Flag

Key specs

Power12 VDC, 30 mA
Eol2 kΩ
Loop300 Ω max plus EOL
Wire ul14–22 AWG
Size6-7/16 x 4-1/4 x 1-1/4 in

Zone pairing read from the TB1 figure (shared middle terminal)

Plug-in 4-pin connector parallels TB2

How to wire it

  1. Connect TB2-1 YEL to Data in from control.
  2. Connect TB2-2 RED to +12 V aux.
  3. Connect TB2-3 BLK to Ground.
  4. Connect TB2-4 GRN to Data out to control.
  5. Connect TB1 1–2 to Zone loop.
  6. Connect TB1 2–3 to Zone loop (2 shared).
  7. Connect TB1 4–5 to Zone loop.
  8. Connect TB1 5–6 to Zone loop (5 shared).
  9. Connect TB1 7–8 to Zone loop.
  10. Connect TB1 8–9 to Zone loop (8 shared).
  11. Connect TB1 10–11 to Zone loop.
  12. Connect TB1 11–12 to Zone loop (11 shared).

Source

4219 Wired Expansion Module Installation Instructions · N8924V4 rev 3/14 Rev. B

Values from N8924V4 rev 3/14 Rev. B.

Verify against the manufacturer's install guide.

Open in builder

Related parts

Planning aid only. Values are typical and vary by manufacturer, code edition and jurisdiction. Verify with manufacturer data, NEC/NFPA/TIA and the local AHJ. HireLV is not liable for designs based on these tools.